north-cormorant-uk

This is the a dedicated page for the above Installation. Below you will find statistics and information for the Rig along with the current rating according to the criteria set on the right of the table.

All items are rated out of 5. Please feel free to submit your own review of this platform. We look forward to sharing your insight with our members and adding your rating to our total.

pricing
Information Accuracy Confidence
Our Confidence
Location
Operator
Installed 1980
Accommodation On Production Platform
POB 214 (Max)
Wifi 5 < 10 Mb (Max)
Other Information
  • The installation is owned and operated by TAQA.
  • Field discovery: August 1974.
  • Date of construction: 1980.
  • Location: approximately 110 miles north-east of Lerwick in the Shetland Islands ( 315 miles North North East of Aberdeen), in water 161m (528ft) deep.
  • Personnel on board: The facilities are equipped for a maximum of up to 214 personnel.
  • Installation structure: The installation consists of an eight-legged steel jacket sub-structure, anchored by piles to the seabed. The Module Support Frame (MSF), which is attached to the jacket, acts as a base support for two levels of modules.
Facilities
  • WiFi
  • Gymnasium
  • Sauna
  • Pool Table(s)
  • Laundry

INSTALLATION REVIEW

3.5
Food
3
Internet
3
Rooms
4
Operator
2
Travel
3.5
Staff
4
Gym
3
Facilities
Users (1 vote) {{ reviewsOverall }} / 5
We would love to accept your review of this installation.

However; in order to 'Rate your Rig' you must be a member.

Login Now

What people say... Login to rate
Order by:

Be the first to leave a review.

User Avatar
/ 5
Verified
{{{ review.rating_title }}}
{{{review.rating_comment | nl2br}}}

Show more
{{ pageNumber+1 }}

Please note: The reviews left on this page are not those of RIGSAY or it’s representative in any way

Leave a Reply